Site icon Garden Route NEWS

Madiba Drive Repair Progress

Good progress is being made on repairs of Madiba Drive, also known as Saasveld road. Months of earth-and foundation work have been done by the Garden Route District Municipality’s (GRDM) Roads Services.  Ten Expanded Public Works Programme (EPWP) contract workers are appointed to assist with the project. The work is performed using in-house resources, personnel, and EPWP contract workers. The Saasveld road has been inaccessible since November’s flash flood last year.

Earlier this year, the old Armco structure under the road was removed, and the work area was accessed.

Approximately 600 m3 of material had to be excavated to reach the bottom of the pipe and to lay the 200 mm diameter pipe in order to prevent the trench from flooding.
On Tuesday, 1 March 2022, a further 600 mm was excavated due to the wetness of the in-situ material. The GRDM Construction Team had sourced more materials to strengthen the bedding before they could lay off the 1.8 m concrete pipe.
 
Read more: http://www.gardenroute.gov.za/2022/04/12/2022-04-12-media-release-saasveld-road-construction-is-nearing-completion/

Exit mobile version